About This Concrete Footing Calculator
Concrete footings spread the structural weight of walls, decks, porches, and garages evenly into undisturbed soil so buildings never settle or crack. Running short by even half a cubic yard halfway through a continuous trench pour creates a weak cold joint and triggers expensive short-load fees from the ready-mix truck.
Our Concrete Footing Calculator turns trench length, footing width (in feet—for example, 1.5 ft for an 18-inch trench), and footing thickness (in inches) directly into ready-mix cubic yards and 60 lb / 80 lb bag equivalents, with a built-in 10% overage allowance for uneven trench walls.
Recommended Depth by Project Type
| Project Application | Recommended Depth | Installation Note |
|---|---|---|
| Garden Retaining Wall Footing | 8 inches | Typical 12–16 in wide trench for low block walls |
| Single-Story / Garage Wall Footing | 12 inches | Common 16–24 in wide reinforced footing |
| Frost-Protected Deep Trench | 18 inches | Check local building code for frost-depth specs |
How to Calculate Concrete Footing Step by Step
- 1Measure total linear footing length in feet (add all wall runs together for perimeter foundations).
- 2Convert footing width to feet (for example, 16 inches = 1.33 ft; 18 inches = 1.5 ft; 24 inches = 2.0 ft).
- 3Multiply Length × Width × (Footing Thickness in inches ÷ 12) to get net Cubic Feet.
- 4Add 10% waste allowance and divide by 27 for ready-mix Cubic Yards (or divide Cubic Feet by 0.60 for 80 lb bags).
Standard Bag Sizes & Coverage Yields
80 lb Concrete Bag (0.60 cu ft)
Yield: 0.6 cu ft per unit (~45 units per cubic yard)
45 bags per cubic yard
60 lb Concrete Bag (0.45 cu ft)
Yield: 0.45 cu ft per unit (~60 units per cubic yard)
60 bags per cubic yard
Pro DIY Tips Before You Order
- ✓Always pour footings on firm, undisturbed native soil—never loose backfill—and verify footing width, depth, and rebar sizing against your local municipal building code.
- ✓Keep #4 or #5 rebar elevated 3 inches off the bottom soil using concrete dobies or rebar chairs so steel stays protected from moisture corrosion.
- ✓If your footing needs more than 1.5 cubic yards (68+ bags of 80 lb concrete), ordering a ready-mix truck or trailer buggy saves tremendous labor and yields a stronger monolithic pour.
Concrete Footing Calculator Frequently Asked Questions
How many 80 lb bags of concrete equal 1 cubic yard?+
One 80 lb bag of pre-mixed concrete yields 0.60 cubic feet, so it takes exactly 45 bags of 80 lb concrete (or 60 bags of 60 lb concrete) to make 1 cubic yard.
Why should I add 10% extra concrete for footings?+
Excavated dirt trenches are rarely perfectly square—sloughed dirt edges and slightly deeper pockets routinely consume 8% to 12% extra concrete.
How wide should a standard concrete wall footing be?+
As a general rule in residential construction, a footing is typically twice as wide as the wall it supports (for instance, a 16-inch footing under an 8-inch CMU block wall), subject to local soil and code rules.
Related Yard & Material Calculators
Concrete Slab Calculator →
Estimate ready-mix cubic yards, 60 lb & 80 lb bag counts, and project budget for backyard patios, sidewalks, shed pads, and garage floors.
Fence Post Concrete Calculator →
Compute exact concrete bag counts for wood or metal fence posts—automatically subtracting the volume displaced by your 4×4 or 6×6 post.
Gravel Base Calculator →
Compute accurate crushed stone base volume and tonnage for sheds, driveways, patios, and concrete slabs—including compaction allowance.
Crusher Run Calculator →
Estimate cubic yards, US tons, and budget for 3/4-inch minus crusher run (ABC gravel / DGA) across driveways and structural sub-bases.